Module Gate
Module Gate: Evaluation & Observability
12 min
- 01Synthesize eval types, tracing, telemetry, and drift into the single closed loop
- 02Demonstrate readiness to apply these concepts to a nondeterministic production system
You’ve covered the two halves of running LLMs in production: evals as your test suite for nondeterministic behavior, and observability as your sensor for silent failures. This gate checks that you can connect them into one loop.
Module Gate
Check the whole module
An exact-match grader keeps failing correct answers that differ only in wording, and your CI gate is flaky. What's the right fix?